Construction Update




Construction Update

Each year Hicksville Public Schools completes construction projects which continue the district's long-range plan of improving facilities. The annual school district budget allocates funds for both capital and maintenance projects to realize this goal. Capital and maintenance projects range in scope from roofing and exterior resurfacing to interior painting and floor refinishing. A detailed listing of specific capital and maintenance projects is itemized below.

Capital Improvement Program


The Capital Improvement Program was begun in July of 2007 and completed in the fall.

Completed Capital Improvement Projects:

Burns Avenue

Installation of a new canopy roof
Replacement (partial) of interior doors

Dutch Lane

Replacement of sidewalk adjacent to bus loop and platform
Replacement (partial) of interior doors

Fork Lane

Reconstruction of exterior wall
Replaced ceilings and lighting in various areas
Replacement (partial) of interior doors

Lee Avenue

Replacement of sidewalk adjacent to bus loop and under walkway canopy
Installation of new roof over (partial) corridor
Replacement (partial) of interior doors

Old Country Road

Installation of new basketball court
New grass field
Replaced ceilings and lighting in various areas
Replacement (partial) of interior doors

Woodland

Re-pointing and replacement of exterior brick
Installation of new louvers
Replacement (partial) of interior doors

Hicksville Middle School

Replacement (partial) of roof over Cafeterias A & B and adjoining areas
Installation of Exterior Insulation Finish System (E.I.F.S.) on exterior of original building
Replacement (partial) of interior doors

Hicksville High School

Reconstruction of chimney

Completed Maintenance Projects:

In addition to capital improvements, the district carefully maintains the interior and exterior of the existing buildings through an annual maintenance program. Maintenance projects which have been completed are listed below.

Burns Avenue

Conversion of Storage Room
Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Replaced counter & sink - room 133A
Installed blinds in one wing

Dutch Lane

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Installed blinds in one wing

East Street

Painted in various areas
Refinished gym floor
Refinished stage floor

Fork Lane

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Installed blinds in one wing

Lee Avenue

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Fenced various areas
Repaired ceilings and lighting in various areas

Old Country Road

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Installed blinds in one wing

Woodland

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor

Hicksville Middle School

Upgraded Psychology Suite
Upgraded Conference Room
Upgraded Principal's Office
Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Fenced various areas
Painted lockers in various areas

Hicksville High School

Replacement of flooring in various areas
Painted in various areas
Refinished gym floor
Refinished stage floor
Renovated girls locker room
Painted lockers in various areas
Replaced blinds in various locations
Replaced one set of exterior doors

Administration

Renovated Curriculum & Instruction office suite

District-wide

Installed Hand Sanitizers in all Cafeterias and other designated areas
Updated parking lots
Updated bus loops

2002 Bond Referendum - 2008 Update

On June 19, 2002 the residents of the Hicksville School District approved a bond referendum for capital improvements to the district's facilities. The work has continued since that time and included a variety of upgrade, renovation, and modernization work. Hicksville Public Schools' eleven facilities have all undergone significant facilities upgrades including the following completed improvement projects:

  • High School Science Room renovations
  • District-wide Heating Plant replacement (24 Boilers)
  • District-wide Window replacement
  • District-wide Public Address System replacement
  • District-wide Fire Alarm System and Electrical upgrades
  • District-wide Roof replacement
  • High School and Middle School Local Area Network (LAN)
  • District-wide Plumbing upgrade & Piping replacement
  • Front Exterior Doors at East Street

    The sweeping district improvements made possible by the 2002 bond referendum have improved the safety, security, energy efficiency, and appearance of our buildings while greatly enhancing the educational environment for all of our students, teachers and staff.

    To view a comprehensive listing and in-progress photos of the building-by-building improvements made possible by the 2002 bond referendum click here.